Not necessarily in order:
- We built Kiosk at the Post Office. It was moved to the Community Center in July,2009.
- The Nutrioso Cemetery Kiosk was funded.
- We poured new concrete slab over basketball court.
- Built Ramada and installed lights and electrical outlets.
- Had bathrooms remodeled.
- Sponsored a little league baseball team.
- Worked on building foundation and started repointing blocks.
- Installed phones.
- Held many successful BBQ’s and Rummage Sales.
- Built storage shed.
- Had concrete walkways installed.
- The building has been made ADA compliant.
- We upgraded the kitchen with a stove,refrigerator,dough mixer,new sink and a hot water heater.
- The kitchen,main room and hallway walls have been repaired and painted.
- Hallway lights upgraded.
- Heating system installed,gas lines,furnace exhausts,new hallway walls and ceiling also installed.
- Rear windows and seals repaired,painted and several windows replaced.
- Secured and refinished picnic tables.
- Purchased some new tables and chairs.
- Poured a concrete pad for the propane tank.
- Installed horseshoe pits.
- Recoated blackboards.
- Secondary entrance repaired and repainted.
- Roof leaks patched.
- Electrical box installed on the s/w corner of building.
- Purchased miscellaneous BBQ equipment.
- Purchased NCA trashcans.
- Purchased a wet/dry vacuum.
- Wood floors in the main room,hallway and kitchen have been sanded and coated.
- A permanent bandstand is in place under the Ramada.
- A new kitchen sin with a sprayer was purchased and relocated under the windows on the south end of the kitchen.
- We have purchased portable chair and table utility racks.
- Bear and Beaver figures were added to the Ramada and at the south end of the Community Center.
- A roof extension over the sidewalk on the north side of the building was installed.
- Electrical receptacles were rewired on the south side of the building.
- Electrical receptacles were installed in the kitchen.
- A 21 x 23 concrete slab with an A-frame metal roof has been built in front of the BBQ pit.
- A concrete slab was poured to connect the handicap parking area with the Ramada for wheelchair access.
- Concrete was poured to connect the south patio entrance and sidewalk.
- A wall with a door has been built to enclose the south furnace unit.
- Shelves were built inside the storage shed.
- We purchased 2 new deep fat fryers and extra baskets.
- Lights have been installed in the attic.
- The Wolf stove was replaced with a new Sears 36” four
- burner stove that is user friendly.
- The front and side windows have been replaced,framing repaired and primer applied.
- A wooden bear with “Nutrioso Community Center” was placed just above the front windows.
- The Nutrioso name and the towns established dates were put on the water tank.
- Custom cabinets and counter tops were installed in the kitchen.
- A Frigidaire chest freezer was purchased for the kitchen.
- Handles have been installed on the kitchen drawers and cabinets.
- Kitchen rods and curtains have been installed.
- A hand sink has been installed in the kitchen.
- The kitchen ceiling lights have been renovated.
- An 8’ ladder has been purchased.
- A large ice chest was purchased.
- A two-wheel dolly was purchased.
- Stainless steel steam table &prep tables have been purchased and installed.
- Wall unit microwave has been installed.