NCA Goals and Accomplishments
This amazing list is below though not necessarily in the order of completion.
NCA Accomplishment Since Inception Not necessarily in order:
- We built Kiosk at the Post Office. It was moved to the
Community Center in July, 2009. - The Nutrioso Cemetery Kiosk was funded.
- We poured new concrete slab over basketball court.
- Built Ramada and installed lights and electrical outlets.
- Had bathrooms remodeled.
- Sponsored a little league baseball team.
- Worked on building foundation and started repointing
blocks. - Installed phones.
- Held many successful BBQ’s and Rummage Sales.
- Built storage shed.
- Had concrete walkways installed.
- The building has been made ADA compliant.
- We upgraded the kitchen with a stove, refrigerator, dough
mixer, new sink and a hot water heater. - The kitchen, main room and hallway walls have been
repaired and painted. - Hallway lights upgraded.
- Heating system installed, gas lines, furnace exhausts,
new hallway walls and ceiling also installed. - Rear windows and seals repaired, painted and several
windows replaced. - Secured and refinished picnic tables.
- Purchased some new tables and chairs.
- Poured a concrete pad for the propane tank.
- Installed horseshoe pits.
- Recoated blackboards.
- Secondary entrance repaired and repainted.
- Roof leaks patched.
- Electrical box installed on the s/w corner of building.
- Purchased miscellaneous BBQ equipment.
- Purchased NCA trashcans.
- Purchased a wet/dry vacuum.
- Wood floors in the main room, hallway and kitchen have
been sanded and coated. - A permanent bandstand is in place under the Ramada.
- A new kitchen sin with a sprayer was purchased and
relocated under the windows on the south end of the
kitchen. - We have purchased portable chair and table utility racks.
- Bear and Beaver figures were added to the Ramada
and at the south end of the Community Center. - A roof extension over the sidewalk on the north side of
the building was installed. - Electrical receptacles were rewired on the south side of
the building. - Electrical receptacles were installed in the kitchen.
- A 21 x 23 concrete slab with an A-frame metal roof
has been built in front of the BBQ pit. - A concrete slab was poured to connect the handicap
parking area with the Ramada for wheelchair access. - Concrete was poured to connect the south patio entrance
and sidewalk. - A wall with a door has been built to enclose the south
furnace unit. - Shelves were built inside the storage shed.
- We purchased 2 new deep fat fryers and extra baskets.
- Lights have been installed in the attic.
- The Wolf stove was replaced with a new Sears 36” four
burner stove that is user friendly. - The front and side windows have been replaced, framing re repaired and primer applied.
- A wooden bear with “Nutrioso Community Center” was
placed just above the front windows.
- The Nutrioso name and the towns established date were
put on the water tank. - Custom cabinets and counter tops were installed in the
kitchen. - A Frigidaire chest freezer was purchased for the kitchen.
Future Goals:
- The following goals are not necessarily listed in the order they will be done.
- Painting of the front and side windows is still
pending. - An outdoor BBQ will be built for the communities use.
- Wiring for the storage closets and ceiling fans will be installed in the attic.
- The storage closets at the south end of the main room will be repaired and painted.
- The floors in the storage closets will be sanded and finished.
- Insulation will be put in the attic.
- Handles will be put on the kitchen drawers and cabinets
- Kitchen rods and curtains will be purchased for the lower windows.
- A hand sink will be installed in the kitchen.
- The pressure tank upgraded and line hooked up to the water tank.
- The BBQ pit area will be upgraded and will have a new roof installed.
- A box (coffin) will be built to barbecue the beef and beans for our annual BBQ. To include a chain fall to lower and lift the box.
- Ceiling lights will be renovated in the kitchen and the main room.
- Ceiling fans will be installed in the kitchen and main room.
- The paneling will be replaced in the hall and main room.
- An 8’ ladder and/or extension platform ladder will be purchased.
- A two wheel dolly will be purchased.
- Steam tables will be purchased for the kitchen.
- Stainless steel prep tables will be purchased for the kitchen.
- The ceilings will be replaced in the main room and in the kitchen.
- A new wall mount microwave with a fan will be purchased for our kitchen.
- Free up all of the windows so they can be opened.